Fluoropolymer Exterior Coating
Fluoropolymer Exterior Coating
Product Name: 18L Bucket Fluoropolymer Exterior Coating, Ultra Weatherproof Self-cleaning High-end Building Facade Paint
Specifications
Item | Specification |
Full Name | FLUOROPOLYMER EXTERIOR COATING |
Brief Introduction | Premium fluorocarbon resin based exterior coating with exceptional weather resistance and self-cleaning property. Service life 20+ years, used for high-end buildings, landmarks and metal curtain walls. |
Core Advantages | 1. Ultra weather resistance, 20+ years service life 2. Self-cleaning, rain washes away dirt 3. Excellent UV and chemical resistance 4. Anti-corrosion, protects metal and concrete 5. Superior color and gloss retention 6. Hard film, scratch resistant |
Application Scenarios | High-rise building facade, landmark buildings, metal curtain wall, aluminum composite panel, bridge, industrial anti-corrosion, coastal buildings |
Mix Ratio | Two-component: base : curing agent = 10:1 by weight, stir well, use within 4–6 hours; single-component: ready to use |
Storage & Shelf Life | Seal bucket, store at 5℃–35°C cool dry place, avoid moisture and direct sunlight; shelf life 12 months |
Package Info | 18L metal/plastic bucket; custom colors and labels available |
Product Certifications | ISO9001 certification, 2000h artificial weathering report, salt spray resistance report |
Factory Support | OEM & ODM acceptable; custom color and gloss; free technical support |
Technical Parameters
Parameter | Value |
Single Bucket Capacity | 18L |
Product Type | Fluorocarbon resin exterior coating |
Theoretical Coverage | 6–8 m²/L per coat |
Artificial Weathering | ≥2000h no abnormality |
Salt Spray Resistance | ≥1000h |
Wash Resistance | ≥10000 cycles |
Stain Resistance | ≤5% |
Surface Dry Time | ≤1h |
Recoat Interval | 4–24h |
Operating Temperature | 5℃ ~ 35℃ |
Construction Method
Base Surface Treatment: Clean and dry surface; apply anti-alkali primer; for metal, apply anti-rust primer; ensure no dust or oil.
Mixing: For two-component, mix base and curing agent at ratio, stir 3–5 minutes, rest 15 minutes (induction); use within pot life.
Application: Apply 2 coats by spray, roller or brush; recommended spray for best finish; allow 4–24h between coats; total dry film 60–80μm.
Curing: Full cure in 7 days; avoid rain and high humidity during curing; clean tools with special thinner immediately.
Order & Delivery Terms
MOQ: Full 20ft container; small trial order can be negotiated
Production Lead Time: 7–12 working days after receiving deposit
Loading Port: Shenzhen Port / Guangzhou Port
Payment Terms: 30% T/T deposit, 70% balance before shipment; Irrevocable L/C at sight supported
Supply Capacity: 3000 tons per month
After-sales Support
Free online professional construction technical guidance for overseas construction teams
Complete factory inspection report and full set customs clearance documents provided
Adjust product formula according to local climate and wall construction requirements
Free replacement for unqualified goods caused by production within shelf life