Textured Stucco Finish

Product description

Textured Stucco Finish

Product Name: 25kg Bag Textured Stucco Finish Powder, Decorative Texture Coating For Exterior & Interior Walls

Specifications

Item

Specification

Full Name

TEXTURED STUCCO FINISH (POWDER TYPE)

Brief Introduction

Dry powder textured stucco coating with sand aggregate, creating various decorative texture patterns by trowel, roller or brush. Polymer modified for excellent weather resistance and adhesion.

Core Advantages

1. Rich texture patterns, customizable finishes 2. Excellent weather and UV resistance 3. Water repellent, breathable 4. Strong adhesion, no cracking 5. Dry powder, eco-friendly, low VOC 6. Easy to repair and maintain

Application Scenarios

Exterior building facades, interior feature walls, villa decoration, commercial building texture finish, EIFS top coat

Mix Ratio

Powder : Water = 25kg : 6.5–7.5L, stir 3–5 minutes, rest 5 minutes then use

Storage & Shelf Life

Sealed moisture-proof bag, store in dry cool place; shelf life 12 months

Package Info

25kg kraft paper bag with PE inner liner; custom colors and printing available

Product Certifications

ISO9001 certification, weather resistance test report, low VOC report

Factory Support

OEM & ODM acceptable; custom texture and color; free sample and technical support

 

Technical Parameters

Parameter

Value

Single Bag Weight

25kg / /bag

Product Type

Dry powder textured stucco coating

Theoretical Coverage

2–4 kg/m² (1.5–2.5mm thick)

Artificial Weathering

≥500h no abnormality

Water Resistance (168h)

No bubbling, no peeling

Alkali Resistance (48h)

No abnormality

Bonding Strength

≥0.5 MPa

Wash Resistance

≥2000 cycles

Operating Temperature

5℃ ~ 35℃

Storage Life

12 months

 

Construction Method

Base Surface Treatment: Apply primer after putty leveling; ensure base solid, clean and dry; mask non-target areas.

Mixing: Add powder to water, stir 3–5 minutes to uniform paste, rest 5 minutes; adjust water for desired texture consistency.

Application: Apply with trowel, roller or special texture tool to create desired pattern; thickness 1.5–2.5mm; work in sections for uniform finish.

Curing & Protection: Allow 24 hours to dry; apply transparent top coat for extra protection if needed; protect from rain during curing.

Order & Delivery Terms

MOQ: Full 20ft container; small trial order can be negotiated

Production Lead Time: 7–12 working days after receiving deposit

Loading Port: Shenzhen Port / Guangzhou Port

Payment Terms: 30% T/T deposit, 70% balance before shipment; Irrevocable L/C at sight supported

Supply Capacity: 3000 tons per month

After-sales Support

Free online professional construction technical guidance for overseas construction teams

Complete factory inspection report and full set customs clearance documents provided

Adjust product formula according to local climate and wall construction requirements

Free replacement for unqualified goods caused by production within shelf life