Textured Stucco Finish
Textured Stucco Finish
Product Name: 25kg Bag Textured Stucco Finish Powder, Decorative Texture Coating For Exterior & Interior Walls
Specifications
Item | Specification |
Full Name | TEXTURED STUCCO FINISH (POWDER TYPE) |
Brief Introduction | Dry powder textured stucco coating with sand aggregate, creating various decorative texture patterns by trowel, roller or brush. Polymer modified for excellent weather resistance and adhesion. |
Core Advantages | 1. Rich texture patterns, customizable finishes 2. Excellent weather and UV resistance 3. Water repellent, breathable 4. Strong adhesion, no cracking 5. Dry powder, eco-friendly, low VOC 6. Easy to repair and maintain |
Application Scenarios | Exterior building facades, interior feature walls, villa decoration, commercial building texture finish, EIFS top coat |
Mix Ratio | Powder : Water = 25kg : 6.5–7.5L, stir 3–5 minutes, rest 5 minutes then use |
Storage & Shelf Life | Sealed moisture-proof bag, store in dry cool place; shelf life 12 months |
Package Info | 25kg kraft paper bag with PE inner liner; custom colors and printing available |
Product Certifications | ISO9001 certification, weather resistance test report, low VOC report |
Factory Support | OEM & ODM acceptable; custom texture and color; free sample and technical support |
Technical Parameters
Parameter | Value |
Single Bag Weight | 25kg / /bag |
Product Type | Dry powder textured stucco coating |
Theoretical Coverage | 2–4 kg/m² (1.5–2.5mm thick) |
Artificial Weathering | ≥500h no abnormality |
Water Resistance (168h) | No bubbling, no peeling |
Alkali Resistance (48h) | No abnormality |
Bonding Strength | ≥0.5 MPa |
Wash Resistance | ≥2000 cycles |
Operating Temperature | 5℃ ~ 35℃ |
Storage Life | 12 months |
Construction Method
Base Surface Treatment: Apply primer after putty leveling; ensure base solid, clean and dry; mask non-target areas.
Mixing: Add powder to water, stir 3–5 minutes to uniform paste, rest 5 minutes; adjust water for desired texture consistency.
Application: Apply with trowel, roller or special texture tool to create desired pattern; thickness 1.5–2.5mm; work in sections for uniform finish.
Curing & Protection: Allow 24 hours to dry; apply transparent top coat for extra protection if needed; protect from rain during curing.
Order & Delivery Terms
MOQ: Full 20ft container; small trial order can be negotiated
Production Lead Time: 7–12 working days after receiving deposit
Loading Port: Shenzhen Port / Guangzhou Port
Payment Terms: 30% T/T deposit, 70% balance before shipment; Irrevocable L/C at sight supported
Supply Capacity: 3000 tons per month
After-sales Support
Free online professional construction technical guidance for overseas construction teams
Complete factory inspection report and full set customs clearance documents provided
Adjust product formula according to local climate and wall construction requirements
Free replacement for unqualified goods caused by production within shelf life