C1 Cementitious Tile Adhesive
C1 Cementitious Tile Adhesive
Product Name: 25kg Bag C1 Cementitious Tile Adhesive, Standard Grade Thin-set Mortar For Ceramic & Porcelain Tiles
Specifications
Item | Specification |
Full Name | C1 CEMENTITIOUS TILE ADHESIVE |
Brief Introduction | Standard grade cement-based tile adhesive meeting EN 12004 C1 requirements. Polymer modified for improved adhesion and workability. Suitable for interior wall and floor tiling with ceramic tiles. |
Core Advantages | 1. Meets EN 12004 C1 standard 2. Good workability, long open time 3. Strong adhesion to concrete and cement screed 4. No need to soak tiles, thin-bed construction 5. Water resistant, suitable for wet areas 6. Cost-effective for large projects |
Application Scenarios | Interior kitchen & bathroom tiling, residential floor tiling, balcony ceramic tiles, commercial wall tiling |
Mix Ratio | Powder : Water = 25kg : 5.5–6.5L, stir 3–5 minutes, rest 5 minutes then re-stir |
Storage & Shelf Life | Sealed moisture-proof bag, store in dry warehouse below 35°C; shelf life 6 months |
Package Info | 25kg kraft paper bag with PE inner liner; custom printing available |
Product Certifications | ISO9001 certification, EN 12004 C1 test report, bonding strength test report |
Factory Support | OEM & ODM acceptable; adjust open time and flexibility; free bag design |
Technical Parameters
Parameter | Value |
Single Bag Weight | 25kg / /bag |
Product Type | Cement-based tile adhesive (C1, EN 12004) |
Adhesion (Original) | ≥0.5 MPa |
Adhesion (After Immersion) | ≥0.5 MPa |
Open Time | ≥15 min |
Slip | ≤0.5 mm |
Working Time | 30–45 min |
Trowel Size | 6×6mm / 8×8mm |
Operating Temperature | 5℃ ~ 35℃ |
Storage Life | 6 months |
Construction Method
Base Surface Treatment: Ensure base flat, solid and clean; remove dust, oil and loose particles; wet absorbent surface slightly.
Mixing: Add powder to measured water, electric stir 3–5 minutes to smooth paste, rest 5 minutes then re-stir briefly.
Application: Spread adhesive with notched trowel, comb uniform ridges; press tile into adhesive with slight twisting motion; do not apply more area than can be tiled within open time.
Curing: Allow 24 hours before grouting, 48 hours before light foot traffic, 7 days for full strength.
Order & Delivery Terms
MOQ: Full 20ft container; small trial order can be negotiated
Production Lead Time: 7–12 working days after receiving deposit
Loading Port: Shenzhen Port / Guangzhou Port
Payment Terms: 30% T/T deposit, 70% balance before shipment; Irrevocable L/C at sight supported
Supply Capacity: 3000 tons per month
After-sales Support
Free online professional construction technical guidance for overseas construction teams
Complete factory inspection report and full set customs clearance documents provided
Adjust product formula according to local climate and wall construction requirements
Free replacement for unqualified goods caused by production within shelf life