18L Lightweight Foamed Waterproof Backfill Material

Product description

Product Description

Product Name

Backfill Balancer – Lightweight Foamed Waterproof Backfill Material

Brief Introduction

A lightweight foamed filling material specially developed for sunken bathroom floors, toilet pits, kitchen pipe areas, and other small backfilling projects. Its low-density formula reduces structural load while providing reliable compressive strength and moisture resistance.

It offers an efficient alternative to traditional brick, construction-waste, sand, and gravel backfilling, helping reduce excessive floor loading, settlement, concealed gaps, and potential water leakage.

Core Advantages

  1. Lightweight formula helps reduce structural floor loading
  2. Integrated filling structure minimizes concealed gaps and leakage risks
  3. Reliable compressive strength helps prevent long-term settlement
  4. One-step pouring enables faster and more efficient installation
  5. Moisture- and mold-resistant for humid bathroom environments
  6. Stable cured structure with low shrinkage and cracking risk

Applications

Suitable for:

  • Sunken bathroom and toilet floors
  • Bathroom pit backfilling
  • Kitchen pipe-area filling
  • Pipeline protection and surrounding filling
  • Small-space lightweight backfilling
  • Residential and commercial renovation projects

Mixing Instructions

Mix thoroughly with the specified amount of matching foaming agent according to the recommended ratio. The exact mixing ratio may be adjusted according to the required density, filling depth, and project conditions.

Storage and Shelf Life

Keep the bucket tightly sealed with its leak-proof inner plug. Store in a cool, dry, and well-ventilated place at 5°C–35°C. Protect from freezing, direct sunlight, and prolonged exposure to high temperatures.

Shelf life: 12 months when stored unopened under recommended conditions.

Packaging

  • 18L plastic bucket
  • Leak-proof inner plug
  • Custom bucket labels available
  • Private-label branding available
  • Custom logo and packaging-color services available

Certifications and Test Reports

  • ISO 9001 Quality Management System Certification
  • Compressive strength test report
  • Water-resistance test report
  • Environmental performance test report

OEM & ODM Services

OEM and ODM services are available. Product density, compressive strength, curing performance, and moisture resistance can be adjusted according to local climate and construction requirements. Custom label design, logo printing, and packaging-color matching are also available.

Technical Specifications

ParameterSpecification
Single Bucket Capacity18L per bucket
Product TypeLightweight waterproof foamed backfill material
Compressive Strength≥0.3 MPa
Initial Hardening TimeApproximately 24 hours
Application Temperature10°C–35°C
Shelf Life12 months

The stated values may vary depending on the mixing ratio, ambient temperature, humidity, filling depth, and on-site construction conditions.

Application Instructions

1. Substrate Preparation

Ensure that the base is solid and stable. Remove dust, oil, standing water, loose materials, and construction debris. Repair visible cracks and complete the required waterproofing treatment before backfilling.

2. Protect Pipes and Floor Drains

Secure all pipes, floor drains, and fittings before construction. Mark the required filling height and protect drainage openings from blockage.

3. Prepare the Mixture

Mix the backfill material thoroughly with the matching foaming agent according to the specified ratio. Continue mixing until a uniform foamed consistency is achieved.

4. Pour and Level

Pour the prepared material evenly into the required area. Distribute it around pipes and corners without leaving large cavities, then level the surface to the specified height.

5. Curing

Protect the filled area from impact, heavy loading, and water exposure during initial curing. Initial hardening takes approximately 24 hours. Allow sufficient curing time before proceeding with subsequent mortar, waterproofing, or tile-installation work.

Order and Delivery Terms

Minimum Order Quantity

One full 20-foot container. Small trial orders may be negotiated.

Production Lead Time

Approximately 7–12 working days after receipt of the deposit.

Loading Ports

Shenzhen Port or Guangzhou Port

Payment Terms

  • 30% deposit by T/T
  • 70% balance payable before shipment
  • Irrevocable L/C at sight is acceptable

Monthly Production Capacity

Up to 3,000 tons per month.

After-Sales Support

  1. Free professional online application guidance for overseas construction teams
  2. Complete factory inspection reports and customs-clearance documents provided
  3. Formula adjustment according to local climate and project requirements
  4. Free replacement of nonconforming products caused by manufacturing defects within the shelf-life period