18L Eco Floor Consolidation and Interface Primer
Product Description
Product Name
Eco Floor Consolidation and Interface Primer
Brief Introduction
A low-VOC, water-based sealing primer developed for cement and concrete floor preparation. It penetrates and consolidates loose or dusty substrates, reduces surface sanding and dusting, and creates a stable interface for subsequent flooring materials.
The primer improves the adhesion of self-leveling compounds, tile adhesives, and cement mortars while helping reduce moisture penetration, floor hollowing, and coating delamination.
Core Advantages
- Low-odor, low-VOC water-based formula
- Consolidates loose cement floors and reduces sanding and dusting
- Helps reduce moisture penetration and damp-related flooring problems
- Improves the adhesion of self-leveling compounds and tile adhesives
- Forms a durable sealed surface with good wear resistance
- Fast drying helps shorten the flooring construction cycle
Applications
Suitable for substrate preparation on:
- Interior cement floors
- New concrete floors
- Loose or sandy cement surfaces
- Dusty and highly absorbent floors
- Floors before self-leveling application
- Substrates before tile installation
- Residential and commercial interiors
Mixing and Dilution
Stir thoroughly before application. Dilute with 10%–15% clean water by volume according to the substrate’s absorbency and on-site application conditions.
Do not exceed the recommended dilution ratio, as excessive water may reduce consolidation and bonding performance.
Storage and Shelf Life
Keep the bucket tightly sealed with its leak-proof inner plug. Store in a cool, dry, and well-ventilated place at 5°C–35°C. Protect from freezing, direct sunlight, and prolonged exposure to high temperatures.
Shelf life: 12 months when stored unopened under recommended conditions.
Packaging
- 18L plastic bucket
- Leak-proof inner plug
- Custom bucket labels available
- Private-label branding available
- Custom logo and packaging-color services available
Certifications and Test Reports
- ISO 9001 Quality Management System Certification
- Low-VOC environmental test report
- Bonding-strength test report
- Substrate-consolidation performance test report
OEM & ODM Services
OEM and ODM services are available. Product penetration, viscosity, drying time, bonding performance, and color can be adjusted according to local climate, substrate conditions, and flooring requirements.
Custom label design, logo printing, and packaging-color matching services are also available.
Technical Specifications
| Parameter | Specification |
|---|---|
| Single Bucket Capacity | 18L per bucket |
| Product Type | Low-VOC floor consolidation and dust-control primer |
| Dilution Ratio | 10%–15% clean water by volume |
| Main Functions | Substrate consolidation, dust control, sealing and adhesion enhancement |
| Wear Resistance | Durable wear-resistant sealed film |
| Surface Drying Time | Approximately 1.2 hours |
| Recommended Storage Temperature | 5°C–35°C |
| Shelf Life | 12 months |
Drying time, coverage, and final performance may vary depending on temperature, humidity, substrate absorbency, application thickness, and ventilation.
Application Instructions
1. Substrate Preparation
Ensure that the floor is solid, flat, and free from loose particles. Remove dust, oil, laitance, standing water, old coatings, and other contaminants. Repair cracks, holes, and damaged areas with suitable repair mortar.
New concrete must be sufficiently cured before primer application.
2. Stir and Dilute
Stir the product thoroughly until uniform. Add 10%–15% clean water by volume and mix completely before application.
3. Apply the Primer
Apply an even coat using a roller, brush, or suitable spraying equipment. Ensure complete coverage without missed areas, puddles, or excessive accumulation.
Highly absorbent or severely dusty substrates may require a second coat after the first coat has dried.
4. Drying and Subsequent Construction
Allow the primer to dry completely and form a stable sealed surface before applying self-leveling compounds, tile adhesives, mortars, or other flooring materials. Protect the treated surface from water, dust, heavy traffic, and contamination during drying.
Order and Delivery Terms
Minimum Order Quantity
One full 20-foot container. Small trial orders may be negotiated.
Production Lead Time
Approximately 7–12 working days after receipt of the deposit.
Loading Ports
Shenzhen Port or Guangzhou Port
Payment Terms
- 30% deposit by T/T
- 70% balance payable before shipment
- Irrevocable L/C at sight is acceptable
Monthly Production Capacity
Up to 3,000 tons per month.
After-Sales Support
- Free professional online application guidance for overseas construction teams
- Complete factory inspection reports and customs-clearance documents provided
- Formula adjustment according to local climate, floor substrate, and construction requirements
- Free replacement of nonconforming products caused by manufacturing defects within the shelf-life period