Vitrified Bead Insulation Mortar

Product description

 Vitrified Bead Insulation Mortar

Product Name: 25kg Bag Vitrified Bead Thermal Insulation Mortar, Lightweight Fireproof Wall Insulation System

Specifications

Item

Specification

Full Name

VITRIFIED BEAD INSULATION MORTAR

Brief Introduction

Lightweight inorganic thermal insulation mortar made of vitrified micro-beads as aggregate and polymer modified cement as binder. Excellent thermal insulation, fire resistance and aging resistance, suitable for exterior and interior wall insulation.

Core Advantages

1. Class A fireproof, non-combustible inorganic material 2. Low thermal conductivity ≤0.07 W/(m·K) 3. Lightweight, reduces building load 4. Good breathability, no condensation 5. Strong bonding, no cracking or hollowing 6. Anti-aging, weather resistant, 25+ years service life

Application Scenarios

Exterior wall insulation, interior wall insulation, roof insulation, basement wall insulation, energy-saving renovation projects

Mix Ratio

Powder : Water = 25kg : 7–8L, stir 3–5 minutes, rest 3 minutes then use

Storage & Shelf Life

Sealed bag with moisture-proof liner, store in dry warehouse, protect from rain and moisture; shelf life 6 months

Package Info

25kg kraft paper bag with PE inner liner; custom printing available

Product Certifications

ISO9001 certification, thermal conductivity test report, fire resistance Class A report

Factory Support

OEM & ODM acceptable; adjust density and insulation grade; free technical support for system matching

 

Technical Parameters

Parameter

Value

Single Bag Weight

25kg / /bag

Product Type

Inorganic vitrified bead thermal insulation mortar

Dry Density

300–400 kg/m³

Thermal Conductivity

≤0.070 W/(m·K)

Compressive Strength

≥0.4 MPa

Bonding Strength

≥0.15 MPa

Fire Rating

Class A (non-combustible)

Softening Coefficient

≥0.6

Operating Temperature

5℃ ~ 35℃

Storage Life

6 months

 

Construction Method

Base Surface Treatment: Clean wall surface, remove dust and oil, wet the base, apply interface agent if needed.

Mixing: Add water first then powder, electric stir 3–5 minutes to uniform paste, rest 3 minutes before use.

Plastering: Apply in 2–3 layers, each layer 10–15mm thick, total thickness 20–40mm; press compact while plastering.

Curing: Natural curing 7 days, protect from rain and direct sunlight within 24 hours after application.

Order & Delivery Terms

MOQ: Full 20ft container; small trial order can be negotiated

Production Lead Time: 7–12 working days after receiving deposit

Loading Port: Shenzhen Port / Guangzhou Port

Payment Terms: 30% T/T deposit, 70% balance before shipment; Irrevocable L/C at sight supported

Supply Capacity: 3000 tons per month

After-sales Support

Free online professional construction technical guidance for overseas construction teams

Complete factory inspection report and full set customs clearance documents provided

Adjust product formula according to local climate and wall construction requirements

Free replacement for unqualified goods caused by production within shelf life