40kg Soft Soil Stabilizer, Sludge & Mud Solidification Agent For Road Foundation, River Sludge Treatment

Product description

Product Description

ColumnOriginal English Text
Full NameSOFT SOIL STABILIZER
Brief IntroductionSingle-component inorganic soil stabilizer, only mixed with soft mud on site. It can rapidly solidify high-water-content sludge, soft clay and mucky soil, improve soil bearing capacity, turn waste mud into usable road foundation filling material.
Core Advantages1. Fast solidification speed, mud hardens within several hours
2. Greatly improve soil strength & bearing capacity, reduce later settlement
3. Strong dehydration effect, cut soil water content obviously
4. Low mixing dosage, save project cost
5. Non-toxic, environmentally friendly, no secondary pollution
6. Simple construction, mix evenly with excavated mud directly
Application ScenariosHighway & municipal road soft foundation reinforcement, river/lake sludge solidification, construction waste mud treatment, swamp land improvement, subgrade filling, landfill mud stabilization, port silt disposal
Mix RatioSoft Soil : Stabilizer = 100 : 3~8(Adjust according to mud water content)
Storage & Shelf LifeStore in dry, ventilated warehouse, strictly prevent dampness and rain; shelf life 12 months
Package Info40kg woven plastic bag, custom brand logo and bag printing supported
Product CertificationsISO9001 certificate, environmental harmless test report, soil bearing capacity third-party detection report
Factory SupportOEM & ODM available, adjustable formula for high/low water-content mud, free custom packaging design

Specifications

English ItemTechnical Index
Single Package Weight40kg per bag
Mixing Dosage3%~8% of soil weight
Initial Solidification Time2~6h (varies with mud water content)
7d Unconfined Compressive Strength≥0.3MPa
Water Content Reduction Rate30%~60%
Operating Temperature5℃~40℃
Storage Life12 months
Environmental GradeNon-toxic, pollution-free

Construction Method

Mud Excavation & Transportation: Excavate and gather soft sludge from rivers and construction sites, remove large stones and construction debris.
Even Mixing: Add soft soil stabilizer according to the proportion, fully mix with excavators or mixing equipment to ensure full integration of powder and sludge.
Paving & Rolling: Pave the mixed mud to subgrade and backfill areas in time, compact layer by layer.
Natural Curing: Conduct natural outdoor curing for 3~7 days, traffic and covering construction can be carried out after the soil is fully hardened.

Order & Delivery Terms

MOQ: Full 20ft container; small trial order can be negotiated
Production Lead Time: 7–12 working days after receiving deposit
Loading Port: Shenzhen Port / Guangzhou Port
Payment Terms: 30% T/T deposit, 70% balance before shipment; Irrevocable L/C at sight supported
Supply Capacity: 3000 tons per month

After-sales Support

Free online professional construction technical guidance for overseas construction teams
Complete factory inspection report and full set customs clearance documents provided
Adjust product formula according to local climate and wall construction requirements
Free replacement for unqualified goods caused by production within shelf life