Dry-shake Floor Hardener – Metallic
Dry-shake Floor Hardener – Metallic
Product Name: 25kg Bag Dry-shake Metallic Floor Hardener, Wear-resistant Industrial Concrete Floor Topping
Specifications
Item | Specification |
Full Name | DRY-SHAKE FLOOR HARDENER – METALLIC |
Brief Introduction | Metallic aggregate dry-shake floor hardener broadcast onto fresh concrete surface to form a dense, wear-resistant and dust-proof industrial floor topping. Suitable for heavy traffic industrial areas. |
Core Advantages | 1. Extreme wear resistance, 3–5 times ordinary concrete 2. Dust-proof, easy to clean and maintain 3. High impact and compression resistance 4. Seamless, monolithic surface 5. Fast construction, integral with concrete 6. Cost-effective for large industrial floors |
Application Scenarios | Warehouses, factories, workshops, logistics centers, parking garages, loading docks, commercial floors |
Mix Ratio | Ready to use dry powder, broadcast directly onto fresh concrete; dosage 4–6 kg/m² |
Storage & Shelf Life | Sealed moisture-proof bag, store in dry warehouse, protect from moisture; shelf life 6 months |
Package Info | 25kg kraft paper bag with PE inner liner; multiple colors and custom printing available |
Product Certifications | ISO9001 certification, wear resistance test report, compressive strength test report |
Factory Support | OEM & ODM acceptable; custom color and aggregate grade; free construction technical guidance |
Technical Parameters
Parameter | Value |
Single Bag Weight | 25kg / /bag |
Product Type | Metallic aggregate dry-shake floor hardener |
Recommended Dosage | 4–6 kg/m² |
Wear Resistance | ≤25 mm |
Compressive Strength (28d) | ≥80 MPa |
Flexural Strength (28d) | ≥12 MPa |
Surface Hardness | ≥8 Mohs |
Aggregate Type | Metallic iron ore aggregate |
Operating Temperature | 5℃ ~ 35℃ |
Storage Life | 6 months |
Construction Method
Base Concrete Preparation:Pour concrete to required level, vibrate and level; wait until concrete reaches initial set (finger test leaves 3–5mm imprint).
First Broadcast:Spread 2/3 of hardener evenly by hand or mechanical spreader; allow moisture to penetrate, then power float.
Second Broadcast & Finishing:Spread remaining 1/3 hardener perpendicular to first direction; power trowel to smooth, burnish final surface.
Curing: Apply curing compound or wet cure immediately after finishing; protect from traffic for 24 hours, full strength in 7 days.
Order & Delivery Terms
MOQ: Full 20ft container; small trial order can be negotiated
Production Lead Time: 7–12 working days after receiving deposit
Loading Port: Shenzhen Port / Guangzhou Port
Payment Terms: 30% T/T deposit, 70% balance before shipment; Irrevocable L/C at sight supported
Supply Capacity: 3000 tons per month
After-sales Support
Free online professional construction technical guidance for overseas construction teams
Complete factory inspection report and full set customs clearance documents provided
Adjust product formula according to local climate and wall construction requirements
Free replacement for unqualified goods caused by production within shelf life