Cool Roof Reflective Coating
Cool Roof Reflective Coating
Product Name: 18L Bucket Cool Roof Reflective Coating, Solar Reflective Heat-insulating Energy-saving Roof Paint
Specifications
Item | Specification |
Full Name | COOL ROOF REFLECTIVE COATING |
Brief Introduction | High solar reflectance and thermal emissivity roof coating that reflects sunlight and radiates heat, reducing roof surface temperature by 15–25°C. Energy saving, waterproof and weather resistant. |
Core Advantages | 1. Reduces roof surface temp by 15–25°C 2. Solar reflectance ≥0.85, thermal emissivity ≥0.85 3. Cuts indoor cooling energy cost 4. Waterproof and elastic, bridges cracks 5. UV and weather resistant 6. Extends roof membrane service life |
Application Scenarios | Flat roof, metal roof, concrete roof, warehouse roof, factory roof, residential roof, energy saving renovation |
Mix Ratio | Ready to use, stir well before use; no dilution recommended |
Storage & Shelf Life | Seal bucket, store at 5℃–35°C cool place, avoid frost; shelf life 12 months |
Package Info | 18L plastic bucket; white/light colors and custom labels available |
Product Certifications | ISO9001 certification, solar reflectance test report, energy saving certification |
Factory Support | OEM & ODM acceptable; adjust reflectivity and color; free technical support |
Technical Parameters
Parameter | Value |
Single Bucket Capacity | 18L |
Product Type | Solar reflective cool roof coating |
Solar Reflectance | ≥0.85 |
Thermal Emissivity | ≥0.85 |
Impermeability | 0.3MPa, 30min no leak |
Tensile Strength | ≥1.5 MPa |
Elongation at Break | ≥200% |
Surface Dry Time | ≤2h |
Recoat Interval | 4–6h |
Operating Temperature | 5℃ ~ 35℃ |
Construction Method
Base Surface Treatment: Clean roof of dust, oil and loose material; repair cracks and leaks first; ensure dry and solid.
Stirring: Stir coating thoroughly before and during application to keep reflective pigments uniform.
Application: Apply 2 coats with roller or brush, each 0.5–0.8mm thick; for best performance, total dry film ≥0.8mm; allow 4–6h between coats.
Curing & Maintenance: Full cure in 48 hours; recoat every 5–7 years to maintain reflectivity; clean surface annually for best performance.
Order & Delivery Terms
MOQ: Full 20ft container; small trial order can be negotiated
Production Lead Time: 7–12 working days after receiving deposit
Loading Port: Shenzhen Port / Guangzhou Port
Payment Terms: 30% T/T deposit, 70% balance before shipment; Irrevocable L/C at sight supported
Supply Capacity: 3000 tons per month
After-sales Support
Free online professional construction technical guidance for overseas construction teams
Complete factory inspection report and full set customs clearance documents provided
Adjust product formula according to local climate and wall construction requirements
Free replacement for unqualified goods caused by production within shelf life