Cementitious Capillary Crystalline Waterproofing

Product description

Cementitious Capillary Crystalline Waterproofing

Product Name: 25kg Bag Cementitious Capillary Crystalline Waterproofing, Self-healing Concrete Waterproof Coating For Basement & Pool

Specifications

Item

Specification

Full Name

CEMENTITIOUS CAPILLARY CRYSTALLINE WATERPROOFING

Brief Introduction

Cement-based waterproof coating with active chemical catalysts that penetrate into concrete capillary pores and form insoluble crystals, permanently sealing water passages. Self-healing capability for cracks up to 0.4mm.

Core Advantages

1. Permanent waterproofing, crystals grow with moisture 2. Self-heals hairline cracks up to 0.4mm 3. Can be applied on damp or green concrete 4. Resists high hydrostatic pressure (up to 1.5MPa) 5. Non-toxic, safe for drinking water structures 6. No surface film, cannot peel or delaminate

Application Scenarios

Basement walls & floors, swimming pools, water tanks, tunnels, subway stations, dams, underground parking

Mix Ratio

Powder : Water = 25kg : 7.5–8.5L, stir 2–3 minutes, use within 30 minutes

Storage & Shelf Life

Sealed moisture-proof bag, store in dry cool place below 35°C; shelf life 12 months

Package Info

25kg kraft paper bag with PE inner liner; custom printing available

Product Certifications

ISO9001 certification, waterproof performance test report, non-toxic test report

Factory Support

OEM & ODM acceptable; adjust crystal activity grade; free construction technical guidance

 

Technical Parameters

Parameter

Value

Single Bag Weight

25kg / /bag

Product Type

Cementitious capillary crystalline waterproof coating

Impermeability Pressure

≥1.2 MPa (7d)

Self-healing Crack Width

≤0.4 mm

Bonding Strength

≥1.0 MPa

Compressive Strength (28d)

≥18 MPa

Initial Setting Time

≥20 min

Final Setting Time

≤24h

Operating Temperature

5℃ ~ 35℃

Storage Life

12 months

 

Construction Method

Base Surface Treatment: Clean concrete surface, remove laitance and dust, roughen smooth surface, saturate with water for 6 hours.

Mixing: Mix powder with measured water, stir 2–3 minutes to uniform slurry, do not over-mix; use within 30 minutes.

Application: Apply two coats with stiff brush or spray, first coat horizontal, second coat vertical after first coat is touch-dry; total dosage 1.2–1.5 kg/m².

Curing: Moist cure for 48–72 hours with wet cloth or fine water spray; protect from freezing and direct sunlight.

Order & Delivery Terms

MOQ: Full 20ft container; small trial order can be negotiated

Production Lead Time: 7–12 working days after receiving deposit

Loading Port: Shenzhen Port / Guangzhou Port

Payment Terms: 30% T/T deposit, 70% balance before shipment; Irrevocable L/C at sight supported

Supply Capacity: 3000 tons per month

After-sales Support

Free online professional construction technical guidance for overseas construction teams

Complete factory inspection report and full set customs clearance documents provided

Adjust product formula according to local climate and wall construction requirements

Free replacement for unqualified goods caused by production within shelf life