Rapid-setting Hydraulic Water Stop Cement
Rapid-setting Hydraulic Water Stop Cement
Product Name: 25kg Bag Rapid-setting Hydraulic Water Stop Cement, Instant Leak Repair For Concrete Cracks & Pipe Joints
Specifications
Item | Specification |
Full Name | RAPID-SETTING HYDRAULIC WATER STOP CEMENT |
Brief Introduction | Fast-setting hydraulic cement that stops active water leakage in minutes. Expands slightly upon setting to create watertight plug in concrete cracks, pipe penetrations and construction joints. Can be applied under running water. |
Core Advantages | 1. Stops water flow in 1–3 minutes 2. Slight expansion ensures watertight seal 3. Can plug active running water leaks 4. High early strength, 15MPa in 1 hour 5. Durable, permanent repair 6. Easy to use, just add water |
Application Scenarios | Concrete crack leakage, pipe joint sealing, basement water seepage, tunnel leak repair, pool crack repair, construction joint plugging |
Mix Ratio | Powder : Water = 25kg : 3.5–4.0L, mix 30–60 seconds, use immediately |
Storage & Shelf Life | Sealed moisture-proof bag, store in dry warehouse, protect from humidity; shelf life 6 months |
Package Info | 25kg kraft paper bag with PE inner liner; custom printing available |
Product Certifications | ISO9001 certification, setting time test report, waterproof plugging test report |
Factory Support | OEM & ODM acceptable; adjust setting speed; free bag design |
Technical Parameters
Parameter | Value |
Single Bag Weight | 25kg / /bag |
Product Type | Rapid-setting expansive hydraulic cement |
Initial Setting Time | 1–3 min |
Final Setting Time | 3–5 min |
Compressive Strength (1h) | ≥15 MPa |
Compressive Strength (28d) | ≥40 MPa |
Expansion Rate | 0.02%–0.1% |
Impermeability Grade | ≥P10 |
Operating Temperature | 5℃ ~ 35℃ |
Storage Life | 6 months |
Construction Method
Base Surface Treatment: Chisel out V-shaped groove along crack, remove loose material and clean with water, keep damp.
Mixing: Add powder to water, quickly stir 30–60 seconds to thick paste; mix only what can be used in 2 minutes.
Plugging:Press mixed material firmly into leak with gloved hand, hold for 1–3 minutes until set; for heavy flow, use cotton cloth wrapped material to plug first.
Finishing:After initial set, smooth surface and apply waterproof coating for long-term protection; cure with water for 24 hours.
Order & Delivery Terms
MOQ: Full 20ft container; small trial order can be negotiated
Production Lead Time: 7–12 working days after receiving deposit
Loading Port: Shenzhen Port / Guangzhou Port
Payment Terms: 30% T/T deposit, 70% balance before shipment; Irrevocable L/C at sight supported
Supply Capacity: 3000 tons per month
After-sales Support
Free online professional construction technical guidance for overseas construction teams
Complete factory inspection report and full set customs clearance documents provided
Adjust product formula according to local climate and wall construction requirements
Free replacement for unqualified goods caused by production within shelf life