Cementitious Waterproof Coating – Flexible
Cementitious Waterproof Coating – Flexible
Product Name: 18L Liquid + 25kg Powder Flexible Cementitious Waterproof Coating, High Elastic Crack-bridging Waterproof Membrane
Specifications
Item | Specification |
Full Name | CEMENTITIOUS WATERPROOF COATING – FLEXIBLE |
Brief Introduction | High flexibility two-component cementitious waterproof coating with high polymer content. Forms elastic membrane that bridges substrate cracks up to 2mm. Ideal for areas with structural movement and vibration. |
Core Advantages | 1. High elasticity, bridges cracks up to 2mm 2. Excellent flexibility and elongation 3. Resists structural movement and vibration 4. Strong adhesion to various substrates 5. Water and weather resistant 6. Suitable for positive and negative water pressure |
Application Scenarios | Basement walls, roof decks, balconies with movement, swimming pools, tunnels, underground parking, foundation walls |
Mix Ratio | Liquid : Powder = 18L : 25kg, stir 3–5 minutes to uniform slurry, use within 1 hour |
Storage & Shelf Life | Liquid: seal bucket 5℃–35°C, avoid frost; Powder: moisture-proof bag dry storage; shelf life 12 months |
Package Info | 18L plastic bucket (liquid) + 25kg kraft bag (powder) kit; custom labels available |
Product Certifications | ISO9001 certification, flexibility test report, waterproof performance test report |
Factory Support | OEM & ODM acceptable; adjust elasticity grade; free technical support |
Technical Parameters
Parameter | Value |
Kit Specification | 18L liquid + 25kg powder |
Product Type | Two-component flexible cementitious waterproof coating |
Tensile Strength | ≥1.8 MPa |
Elongation at Break | ≥150% |
Crack Bridging Width | ≥2.0 mm |
Impermeability | 0.3MPa, 30min no leak |
Bonding Strength | ≥0.7 MPa |
Surface Dry Time | ≤4h |
Operating Temperature | 5℃ ~ 35℃ |
Storage Life | 12 months |
Construction Method
Base Surface Treatment: Clean and dampen base; apply primer for porous substrates; ensure no standing water.
Mixing: Mix liquid and powder as ratio, electric stir 3–5 minutes, rest 5 minutes; do not add extra water.
Application: Apply 2–3 coats, first coat thin, subsequent coats perpendicular; reinforce with polyester mesh at joints and cracks; total thickness 1.5–2.0mm.
Curing & Test: Cure 72 hours, protect from frost and direct sunlight; conduct water test before tiling or covering.
Order & Delivery Terms
MOQ: Full 20ft container (liquid + powder kits); small trial order can be negotiated
Production Lead Time: 7–12 working days after receiving deposit
Loading Port: Shenzhen Port / Guangzhou Port
Payment Terms: 30% T/T deposit, 70% balance before shipment; Irrevocable L/C at sight supported
Supply Capacity: 3000 tons per month
After-sales Support
Free online professional construction technical guidance for overseas construction teams
Complete factory inspection report and full set customs clearance documents provided
Adjust product formula according to local climate and wall construction requirements
Free replacement for unqualified goods caused by production within shelf life