18kg Bucket Cement Floor Leveling & Repair Compound, Self-Leveling Concrete Patching Material For Indoor Ground Renovation

Mô tả sản phẩm

Product Description

ColumnOriginal English Text
Full NameCEMENT FLOOR LEVELING & REPAIR COMPOUND
Brief IntroductionSingle-component self-leveling liquid repair mortar, only stir evenly before construction. It flows automatically to form smooth flat ground layer, for repairing pits, unevenness, cracks on cement floor, and thin-layer overall leveling construction.
Core Advantages1. Excellent self-leveling property, automatic leveling without manual trowel
2. Fast hardening, walkable after several hours, short construction period
3. High bonding strength, no hollowing, peeling or cracking after curing
4. Fine and smooth surface, perfect base for floor tile, wood floor, epoxy paint
5. Good wear resistance, stable ground bearing capacity
6. Simple construction, low labor cost, high construction efficiency
Application ScenariosIndoor cement floor uneven correction, old floor pit & crack repair, warehouse workshop ground leveling, shopping mall floor renovation, household floor thin layer leveling, before wood floor/epoxy laying ground treatment
Mix RatioCompound : Clean Water = 10 : 1 (Adjust water volume according to required fluidity)
Storage & Shelf LifeSeal bucket tightly, store in cool indoor warehouse, avoid frost and high temperature direct sun; shelf life 12 months
Package Info18kg plastic bucket, custom bucket labels, brand printing and color design available
Product CertificationsISO9001 quality system certificate, floor wear resistance test report, low formaldehyde environmental inspection document
Factory SupportOEM & ODM customizable, adjustable fluidity & hardening speed formula, free customized bucket label design

Specifications

English ItemTechnical Index
Single Bucket Net Weight18kg per bucket
Standard Mix RatioCompound : Clean Water = 10:1
Self-leveling Fluidity≥280mm
Single Pour Thickness2mm – 10mm
24h Compressive Strength≥18MPa
Walkable Time3–5 hours after pouring
Full Curing Time24 hours
Operating Temperature8℃ – 35℃
Storage Life12 months

Construction Method

Base Surface Treatment: Clean floating dust, oil stains and loose cement on the ground, fill large holes with repair mortar in advance, wet the ground and wipe off standing water.
Mixing Operation: Add clean water at ratio 10:1, stir electrically for 2–3 minutes to get smooth slurry without particles, let stand for 2 minutes then stir again.
Pour & Level Construction: Pour slurry evenly on the ground, flatten automatically by self-leveling; pour in layers for areas with large height difference.
Curing Period: Seal and cure for 6 hours after construction, avoid heavy load rolling and long-term water immersion before full curing within 24 hours.

Order & Delivery Terms

MOQ: Full 20ft container; small trial order can be negotiated
Production Lead Time: 7–12 working days after receiving deposit
Loading Port: Shenzhen Port / Guangzhou Port
Payment Terms: 30% T/T deposit, 70% balance before shipment; Irrevocable L/C at sight supported
Supply Capacity: 3000 tons per month

After-sales Support

Free online professional construction technical guidance for overseas construction teams
Complete factory inspection report and full set customs clearance documents provided
Adjust product formula according to local climate and wall construction requirements
Free replacement for unqualified goods caused by production within shelf life

Bạn cũng có thể thích