Rapid-setting Hydraulic Water Stop Cement

รายละเอียดสินค้า

Rapid-setting Hydraulic Water Stop Cement

Product Name: 25kg Bag Rapid-setting Hydraulic Water Stop Cement, Instant Leak Repair For Concrete Cracks & Pipe Joints

Specifications

Item

Specification

Full Name

RAPID-SETTING HYDRAULIC WATER STOP CEMENT

Brief Introduction

Fast-setting hydraulic cement that stops active water leakage in minutes. Expands slightly upon setting to create watertight plug in concrete cracks, pipe penetrations and construction joints. Can be applied under running water.

Core Advantages

1. Stops water flow in 1–3 minutes 2. Slight expansion ensures watertight seal 3. Can plug active running water leaks 4. High early strength, 15MPa in 1 hour 5. Durable, permanent repair 6. Easy to use, just add water

Application Scenarios

Concrete crack leakage, pipe joint sealing, basement water seepage, tunnel leak repair, pool crack repair, construction joint plugging

Mix Ratio

Powder : Water = 25kg : 3.5–4.0L, mix 30–60 seconds, use immediately

Storage & Shelf Life

Sealed moisture-proof bag, store in dry warehouse, protect from humidity; shelf life 6 months

Package Info

25kg kraft paper bag with PE inner liner; custom printing available

Product Certifications

ISO9001 certification, setting time test report, waterproof plugging test report

Factory Support

OEM & ODM acceptable; adjust setting speed; free bag design

 

Technical Parameters

Parameter

Value

Single Bag Weight

25kg / /bag

Product Type

Rapid-setting expansive hydraulic cement

Initial Setting Time

1–3 min

Final Setting Time

3–5 min

Compressive Strength (1h)

≥15 MPa

Compressive Strength (28d)

≥40 MPa

Expansion Rate

0.02%–0.1%

Impermeability Grade

≥P10

Operating Temperature

5℃ ~ 35℃

Storage Life

6 months

 

Construction Method

Base Surface Treatment: Chisel out V-shaped groove along crack, remove loose material and clean with water, keep damp.

Mixing: Add powder to water, quickly stir 30–60 seconds to thick paste; mix only what can be used in 2 minutes.

Plugging:Press mixed material firmly into leak with gloved hand, hold for 1–3 minutes until set; for heavy flow, use cotton cloth wrapped material to plug first.

Finishing:After initial set, smooth surface and apply waterproof coating for long-term protection; cure with water for 24 hours.

Order & Delivery Terms

MOQ: Full 20ft container; small trial order can be negotiated

Production Lead Time: 7–12 working days after receiving deposit

Loading Port: Shenzhen Port / Guangzhou Port

Payment Terms: 30% T/T deposit, 70% balance before shipment; Irrevocable L/C at sight supported

Supply Capacity: 3000 tons per month

After-sales Support

Free online professional construction technical guidance for overseas construction teams

Complete factory inspection report and full set customs clearance documents provided

Adjust product formula according to local climate and wall construction requirements

Free replacement for unqualified goods caused by production within shelf life