Two-component Polyurethane Waterproof Coating
Two-component Polyurethane Waterproof Coating
Product Name: 18L Bucket Two-component Polyurethane Waterproof Coating (A+B), High Strength Chemical-cured Waterproof Membrane
Specifications
Item | Specification |
Full Name | TWO-COMPONENT POLYURETHANE WATERPROOF COATING (A+B) |
Brief Introduction | Two-component chemical-cured polyurethane waterproof coating, component A (prepolymer) mixed with component B (curative) to form high strength, wear-resistant rubber membrane. Fast curing, suitable for heavy-duty waterproofing. |
Core Advantages | 1. Chemical curing, high strength ≥3.5MPa 2. Fast curing, walkable in 4–6h 3. Excellent wear and puncture resistance 4. High elasticity, elongation ≥350% 5. Resists oil and chemical corrosion 6. Suitable for underground and traffic areas |
Application Scenarios | Basement slab, tunnel, bridge deck, underground parking, reservoir, sewage treatment, industrial floor waterproofing |
Mix Ratio | Component A : Component B = 1:2 by weight, electric stir 3–5 minutes, use within 30 minutes |
Storage & Shelf Life | Seal buckets separately, store at 5℃–35°C cool dry place, avoid moisture and frost; shelf life 12 months |
Package Info | 18L bucket kit (A+B components); custom labels available |
Product Certifications | ISO9001 certification, waterproof performance test report, wear resistance test report |
Factory Support | OEM & ODM acceptable; adjust curing speed and hardness; free technical support |
Technical Parameters
Parameter | Value |
Kit Specification | 18L (A+B components) |
Product Type | Two-component chemical-cured polyurethane coating |
Tensile Strength | ≥3.5 MPa |
Elongation at Break | ≥350% |
Impermeability | 0.3MPa, 30min no leak |
Surface Dry Time | ≤4h |
Hard Dry Time | ≤12h |
Wear Resistance | ≤0.05 g/cm² |
Operating Temperature | 5℃ ~ 35℃ |
Storage Life | 12 months |
Construction Method
Base Surface Treatment: Clean, dry and flat base; apply primer; ensure no standing water or dust.
Mixing: Mix A and B at specified ratio, electric stir 3–5 minutes; mix only usable amount within 30 minutes.
Application: Apply 2 coats with squeegee or roller, each 0.8–1.0mm; reinforce joints and cracks with glass fiber mesh; total thickness 1.5–2.0mm.
Curing: Allow 12–24 hours full cure; protect from rain during curing; can be covered with concrete or protective layer after cure.
Order & Delivery Terms
MOQ: Full 20ft container; small trial order can be negotiated
Production Lead Time: 7–12 working days after receiving deposit
Loading Port: Shenzhen Port / Guangzhou Port
Payment Terms: 30% T/T deposit, 70% balance before shipment; Irrevocable L/C at sight supported
Supply Capacity: 3000 tons per month
After-sales Support
Free online professional construction technical guidance for overseas construction teams
Complete factory inspection report and full set customs clearance documents provided
Adjust product formula according to local climate and wall construction requirements
Free replacement for unqualified goods caused by production within shelf life